New electricity and gas supply connections for self-build and home renovations
We install brand new electricity and gas meters for new self-builds and home renovations.
Who are new connections for electricity and gas supply to homes for?
So, you're building your dream home from the ground up, or maybe you're giving an older property a full makeover and there's never been an energy supply there before. You've probably got a million things to think about, and sorting out your new electricity and gas supply might seem like a bit of a headache. Don't worry, that's what we're here for.
Our new connection service is specifically designed for:
New build properties that have never had a gas or electricity supply before.
Renovation projects where you need a brand new connection, not just an upgrade or a re-connection to an existing supply.
Any property where there has never been an energy meter or a supply installed previously.
If you require a business new connection please go to our new meter connections for business.
This is not for home re-connections, business re-connections, disconnections, meter upgrades, or moving an existing meter. If you're looking to switch to a different energy supplier but already have a meter, you can visit our how to switch page. If you have more than 10 plots for a business development, we have a dedicated page for that too.
Get your home connected to electricity and gas
Hassle-free meter installations and supply connections for one plot self-build and renovation projects.
Please call us on 0808 501 5807 or fill in the form and we'll be in touch.

What is a new connection for electricity and gas residential?
A new connection is the process of getting a brand new electricity meter installation and/or a new gas meter installation for a property that's never had one before. This is a key step after your local network operator has installed the necessary pipes or cables to the property.
It's the final piece of the puzzle that allows us, as your energy supplier, to bring power and gas into your new home. This is often the case for new builds and major home renovations.
What is the process for new connection of electricity and gas to a new self-build or house renovation?
Getting a new gas supply to a property or a new electricity supply connected doesn't have to be complicated. We've streamlined the process to make it as simple as possible for you. You'll be assigned a dedicated Energy Specialist who will guide you from your very first contact right up until your first bill lands.
Here's our step-by-step guide to the new electricity meter installation and new gas meter installation process:
1Gathering your information
First things first, we need all the necessary details from you to get the ball rolling. We have a handy checklist to make sure you've got everything ready.
2Account setup and registration
If you choose us as your new energy supplier, we'll set up a new account for you and register your supply in our system. We'll agree on the prices and a contract before this happens, so there are no surprises.
3Registration acceptance
Once the registration is accepted—which usually takes a few working days—we can then look for the next available meter installation appointment.
4Booking the meter installation
As soon as your site is ready and the registration is complete, we'll book your new electricity meter installation or new gas meter installation. We aim to get your meter installed within 15 working days of a registered account and a ready site.
5Your meter installation
On the day of the appointment, our technician will get your new meter connected and make sure everything is working perfectly.
6Welcome to E.ON Next!
Once your meter is up and running, you're officially with us, and we'll be ready to support you with your new energy supply.
Why get your new electricity and gas meter connection from us?
When you're dealing with a new build or a major renovation, you've got a lot on your plate. Choosing us for your new gas supply and new electricity supply means one less thing to worry about. We're here to make the process as straightforward as possible.
One Energy Specialist: You'll have a single point of contact from start to finish. This dedicated expert will be with you every step of the way, from your initial enquiry to your first bill.
Swift and reliable service: We know you want to get connected as quickly as possible. We aim to install your new electricity meter or new gas meter within 15 working days once your account is registered and the site is ready for us.
Here to help: We're always in touch and happy to help with any questions you might have about your new connection.
New home meter connection FAQs
How much is the cost to install a new electricity and gas meter?
The great news is that there's no upfront cost for the new electricity meter installation or new gas meter installation. The cost is included in your yearly tariff prices, which we'll discuss with you before you sign up.
What do I need to get a new electricity or gas connection?
To help us get your new electricity supply or new gas supply connected, you'll need to have a few things ready. This includes your MPAN (Meter Point Administration Number) and/or MPRN (Meter Point Reference Number), which you can get from your local network operator. You'll also need to confirm that your site is ready for the meter installation, with all the necessary cables, pipes, and fuses already in place. Photos of the meter location and your estimated annual energy consumption will also be helpful.
Can I apply for both new gas and electricity connections at the same time?
Yes, you can. We can handle both your new electricity meter installation and your new gas meter installation at the same time. This means you can deal with just one company and one Energy Specialist, making the whole process much simpler.
What is an MPAN or MPRN?
An MPAN (Meter Point Administration Number) is a unique 21-digit reference number for your electricity supply.
An MPRN (Meter Point Reference Number) is a unique 10-digit number for your gas supply.
These numbers are essential for getting your new connection sorted, and you'll need to get them from your local network operator.
How long does it take to get a new electricity or gas meter installed?
Once your account is registered with us and the site is ready for installation, we aim to get your meter installed within 15 working days. We always try to book the earliest possible appointment for you.
Do I need a contract before my new electricity and gas supply is connected?
Yes, we will agree on a contract and prices with you before we register your supply and arrange for your new electricity and gas meter to be installed.
What is a kVA and why does it matter?
A kVA (kilovolt-ampere) is your agreed electricity load, which determines your connection capacity. It's an important detail to have when you're getting a new connection quote, particularly if you need a three-phase meter installed. We only require the kVA to be confirmed for customers who want a three-phase meter.
Can I get a temporary electricity and gas supply for building work?
Yes, we can provide a temporary supply for your building work. Just let us know when you apply that this is what you need.
Do I need a contract before my new electricity and gas supply is connected?
Yes, we will agree on a contract and prices with you before we register your supply and arrange for your new electricity and gas meter to be installed.
Who is the Distribution Network Operator (DNO)?
Your DNO is the company responsible for the physical network of cables, pipes, and other infrastructure that brings gas and electricity to your property. They are a separate entity from your energy supplier (us), and you'll need to contact them to get your MPAN/MPRN and ensure your site is ready for a new connection. You can't choose your DNO or gas transporter, as they are based on your location.